Original commitment
All hydraulic works to meet Aragon water needs.
Verbatim programme quote
“Desarrollar todas las obras hidráulicas para satisfacer las necesidades hídricas de Aragón”
Primary source
Acuerdo PP-VOX Aragón 2023Was this promise kept?
Current verdict
Documented action exists, but the target has not yet been completed.
4 Apr 2026
All hydraulic works to meet Aragon water needs.
Verbatim programme quote
“Desarrollar todas las obras hidráulicas para satisfacer las necesidades hídricas de Aragón”
Primary source
Acuerdo PP-VOX Aragón 2023